Sign In | Join Free | My wneducation.com
China Guangzhou Haozhiquan Water Park Equipment Co., Ltd. logo
Guangzhou Haozhiquan Water Park Equipment Co., Ltd.
MAKE YOUR WATER PARK DREAM COME TRUE
Verified Supplier

2 Years

Home > Water Park Design >

Customized Water Park Design A Water Park Project Tropical Island Theme

Guangzhou Haozhiquan Water Park Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Customized Water Park Design A Water Park Project Tropical Island Theme

Brand Name : HZQ

Model Number : SJ-001

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : LC, T/T

Supply Ability : 5 sets/month

Delivery Time : 15-30 days

Size : 10,000 square meters

Number Of Attractions : 20

Additional Amenities : Locker Rentals, Changing Rooms, Gift Shop

Types Of Attractions : Water Slides, Lazy River, Wave Pool, Children's Play Area, etc.

Hs Code : 95069900

Theme : Tropical Island

Wanrantty : One year

Service : Free design, Customized solution

Packaging Details : Wrapped with cloth and transparent film

Contact Now

Customized Water Park Design Let Our Experienced Team Bring Your Vision to Life

Designing a water park is a complex but rewarding process that combines creativity, engineering, and attention to detail. By focusing on a cohesive theme, guest safety and comfort, and a variety of attractions, designers can create an appealing and successful water park that provides memorable experiences for visitors.

Key Steps in Water Park Design

  1. Concept Development

    • Theme and Vision: Decide on the overall theme and vision of the park, which will guide the design of attractions, landscaping, and amenities. Themes can range from tropical paradises to adventure worlds or futuristic landscapes.
    • Target Audience: Determine the target demographic, such as families, thrill-seekers, or young children, which will influence the types of attractions and facilities.
  2. Site Analysis

    • Location: Choose a suitable location with ample space, good accessibility, and necessary infrastructure like water and electricity.
    • Topography and Climate: Assess the site's topography to incorporate natural features and ensure the design suits the local climate for year-round or seasonal operation.
  3. Master Planning

    • Layout: Create a master plan that outlines the layout of the park, including the placement of attractions, pathways, facilities, and green spaces.
    • Zoning: Divide the park into different zones, such as thrill rides, family areas, kiddie sections, and relaxation spots. Ensure smooth traffic flow and accessibility.
  4. Attraction Selection

    • Variety of Rides: Include a mix of attractions to cater to all ages and preferences. Key attractions often include wave pools, lazy rivers, water slides, splash pads, and thrill rides.
    • Signature Rides: Incorporate unique or innovative rides to differentiate the park and attract visitors.
  5. Safety and Compliance

    • Regulations: Adhere to local and international safety regulations and standards for water parks.
    • Lifeguards and Safety Features: Plan for sufficient lifeguard stations, emergency response areas, and safety features like non-slip surfaces and safety signage.
  6. Facilities and Amenities

    • Changing Rooms and Lockers: Provide adequate changing facilities, lockers, and restrooms.
    • Food and Beverage: Include a variety of food and beverage outlets, ranging from snack bars to sit-down restaurants.
    • Retail Shops: Plan for retail spaces selling swimwear, souvenirs, and essentials.
    • Seating and Shading: Provide ample seating areas with shade structures for relaxation.
  7. Landscape and Environment

    • Thematic Landscaping: Use landscaping to enhance the theme and create a pleasant environment. This includes planting trees, shrubs, and flowers, as well as incorporating water features and decorative elements.
    • Sustainability: Implement sustainable practices such as water recycling, energy-efficient systems, and eco-friendly materials.
  8. Operational Efficiency

    • Staffing: Plan for adequate staffing levels, including ride operators, lifeguards, maintenance crew, and customer service personnel.
    • Maintenance: Design with maintenance in mind, ensuring easy access to mechanical and filtration systems, and plan for regular upkeep.

Details
Available Design Type Planning Design, 3D Design; Landscape Design
Planning Design Free
3D Design Paid
Landscape Design Paid
Design Size Any Size
Design Time 10-30 days

Feature
* Professional design team with more than 20 designers.
* Division of labor and cooperation, different designers are responsible for different designs.
* Experiences designers with experience of 5-20 years.
* Strong R& D designers for customized water attractions.

Product Tags:

Customized Design A Water Park Project

      

Tropical Island Theme Water Park Design

      
Buy cheap Customized Water Park Design A Water Park Project Tropical Island Theme product

Customized Water Park Design A Water Park Project Tropical Island Theme Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Haozhiquan Water Park Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)